Within the scope of the project, constructing all the mechanical (heating, ventilating, air conditioning systems), electrical (low voltage systems, weak current systems) systems and manufacturing lighting systems and all the interior architecture works of office building have been completed (4,349m2).
© Bayrak Proje İnşaat. Tüm Hakları Saklıdır.