With the prepared project of the cleaning of important touristic destination of Turkey which is Uzungol Lake in Trabzon, 180 thousand cubic meters of sediment, consisting of soil and other materials carried by the lake, was transferred to the areas or routes indicated by the administration with dredging pumps.
© Bayrak Project Construction. All Rights Reserved.