The project includes the planning, construction and operation of Gulluk Port, which will be used for the export of feldspar mineral. The port capacity is 6,000,000 tons/year and the loading area is 345 m long and 15 m deep, allowing four ships to dock at the same time. Thanks to the high-tech treatment system in the port, environmental pollution does not occur during the operation period. At the same time, within the scope of the project, the administration building, workshop, canteen, security building, weighbridge and water tank were built.
© Bayrak Proje İnşaat. Tüm Hakları Saklıdır.