It is aimed to carry out the infrastructure, foundation, pipe rack, piping (ASME 31.3), filling platforms, mechanical, electrical and instrumentation works of 3 API 650 tanks, 2 with a capacity of 1550m3 and 1 with a capacity of 2750m3, in the 8th Tank Farm area within the Poliport Tank field. .
© Bayrak Proje İnşaat. Tüm Hakları Saklıdır.