Within the scope of the project, water will be transmitted to the Ayvalık Treatment Plant through pumping stations that will be built in an integrated manner to the existing irrigation channel. In this way, it is aimed to provide permanent solutions to the problems experienced in the city's drinking water supply.
© Bayrak Project Construction. All Rights Reserved.